Deform AB
Menu
  • Home
  • About us
    • Deform's History
    • Privacy Policy
    • Cookie policy
    • Guideline
    • Management, Quality & Environment
    • Work at Deform
  • Business areas
    • Pressure vessels
    • Protection
    • Heavy Fabrication
    • Heavy equipment
  • News & Events
    • Subscription Centre
    • Press Contact
  • Pictures & Documents
    • General Information
    • Pressure Vessel Information
    • Protection Information
    • Heavy Fabrication Information
    • Heavy equipment information
    • Picture Gallery
    • Certificates
  • Contact
    • Personnel

News & Events

  • News & Events
  • Subscription Centre
  • Press Contact

DEFORM DELIVERS TO THE BRIDGE OVER ÖRESUND

Extensive repainting of the Öresund Bridge's 300,000 square meter steel structure is underway. The restoration is to last for several years and places great demands on protection against weather, wind, passing trains and high voltage lines.Therefore, three custom-built platforms were commissioned from Kristianstad Industrial Service.

Deform was given the task of producing the unique steel profiles for the window frames needed in the construction. The sturdy frames were manufactured with very good results using a specially made bending tool.

For more information please contact

  • Technical Sales Manager
    Patrick Wirtanen
    pw@deform.se
    Mob +46 70 229 51 13

BackPrint this article

logo_deform_footer

Deform AB

Strömsnäsvägen 4
693 32 Degerfors
Sweden

Tel: +46 586 473 00
Email: info@deform.se

Deform on Linkedin
© 2025 Deform AB
Privacy policy | Cookie policy